Loading the latest actively exploited vulnerabilities…Powered by Achilles
The CRA Fringe · Issue 10

Dormant and stubbed code as a risk assessment instrument against substantial modification

Daniel Thompson-Yvetot

A new dossier with every issue. Last week’s dossier asked when a website becomes a product. This one asks when a feature you have already built becomes a new product the moment you switch it on.

The most expensive feature on your roadmap may be the one that is already finished. Your sales team has promised it, your engineers have tested it, and it sits switched off until next quarter. Under the Cyber Resilience Act, flipping that switch can turn a change your engineers would call minor into a substantial modification, with a new conformity assessment and a new EU declaration of conformity.

 

This issue’s dossier

Dormant and stubbed code as a risk assessment instrument against substantial modification, prepared by Daniel Thompson-Yvetot, shows CTOs, heads of engineering, product managers and compliance leads how to plan features so that switching them on stays routine, and where that plan fails.

Get the dossier free until 19 November: https://comply.land/dossiers/cra-substantial-modification-dormant-code/

Whether activation counts as a substantial modification depends on a document written before launch. The Commission’s guidance of 27 July 2026 opens a route for features that were anticipated, but only under certain conditions, and a feature nobody wrote down gets no such protection, however small.

Shipping the code switched off is not a shortcut either. Dormant code is part of the product from the first day on the market, and how it is gated matters. The dossier compares four states of code, from dead code to planned-only features, and sets out what a manufacturer should record for each planned feature before launch, what to check before switching it on, and the cases where the approach fails.

The dossier closes with twelve operational steps and six monitoring triggers. As always, it is not legal advice and not a conformity determination.

 

What comes next

Issue 11 will introduce the next dossier. Until then: which feature on your roadmap is already finished and waiting for its switch?